West Bay Harbor Drive Drainage Improvements RFP
See related document for information
Description: See related document for information
City · FL, US
Decision makers connected to this RFP from Town of Bay Harbor Islands.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Posted
Nov 4, 2026
Dec 10, 2026
See related document for information
CitySC
Posted
Oct 16, 2026
Jan 28, 2027
The project t includes the complete installation of 580 LF of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line. In the event that there is a conflict with existing sewer services the contactor shall replace the service affected. There will be one roadway patch of approximately 40’ in length. The contactor shall backfill the trench and install an asphalt patch of 8” stone base and 3” of asphalt surface. The contractor shall also install three (3) residential driveway patches, 6” stone base and 2” surface course, one commercial driveway 8” stone base and 3” asphalt surface course. The contractor shall ensure that the existing drain line has been totally removed, and that grass is in sown over the disturbed areas. The contractor shall minimize disturbance to the residential yards and ensure that the last 4” of the backfill be screened topsoil, without rocks or large clumps.
CitySC
Posted
Nov 13, 2026
Dec 16, 2026
The project will consist of the refurbishment of two (2) wastewater pumping stations. The work at each of the two (2) stations will consist of the installation of a bypass connection, removal of all pump station equipment, refurbishment of the wetwells, grading, installation of the new pump station equipment, electrical work and all appurtenances for a complete Installation. Solicitation #: AEC Project No. 26-012 Full Details / Download: American Engineering, 1300 12 St, Ste. A, Cayce, SC 29033
Michigan Department of Transportation
State AgencyMI
Posted
-
Dec 4, 2026
The project reconstructs and resurfaces 1.17 miles of South Shore Drive from Hopkins Forest Drive to US-31 in Manistee County. Work includes asphalt base crushing, shaping and resurfacing, drainage and aggregate-base improvements, shoulder construction, and pavement-marking upgrades. Prime contractors must meet the stated prequalification requirements or use qualified subcontractors, with the necessary subcontractors designated before contract award.