Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Base Bid: CrystaPlex® 590 Plus, or equivalent, acrylic shielding, seamless ends and radius sections, protective netting and ice hockey dasher board system per attached bid specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of dasher boards, under ice floor grading and painting and arena flooring replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Removal and replacement of dasher boards, under ice floor grading and painting and arena flooring replacement.
AvailablePremium
Access the largest public sector contact database
Project will include signage design and implementation services. The selected design-build firm shall provide complete design, fabrication, and installation services for all permanent signage, wayfinding, code, and environmental graphic elements associated with the arena renovation. The signage program must integrate seamlessly with the architectural design by populous architects and the town of vail s branding standards.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Project will include signage design and implementation services. The selected design-build firm shall provide complete design, fabrication, and installation services for all permanent signage, wayfinding, code, and environmental graphic elements associated with the arena renovation. The signage program must integrate seamlessly with the architectural design by populous architects and the town of vail s branding standards.
AvailableWork includes to renovate party decks; three (3) party decks can be fed from existing main piping and installed under the party decking; install approximately sixteen (16) sprinkler heads, spread below four (4) party decks, on piping along the standoff mounted to concrete; one (1) party deck has no existing sprinkler to run off of and will need to be installed from existing main in the ceiling grid and dropped down to party deck; install shut off valves at each party deck in case of removal of party decks; cutting into decking as it may affect the integrity of the decking; install foam/protection on the grid dropped piping to protect it from stray pucks.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Work includes to renovate party decks; three (3) party decks can be fed from existing main piping and installed under the party decking; install approximately sixteen (16) sprinkler heads, spread below four (4) party decks, on piping along the standoff mounted to concrete; one (1) party deck has no existing sprinkler to run off of and will need to be installed from existing main in the ceiling grid and dropped down to party deck; install shut off valves at each party deck in case of removal of party decks; cutting into decking as it may affect the integrity of the decking; install foam/protection on the grid dropped piping to protect it from stray pucks.
AvailableThis RFP is for hockey equipment and sponsorship for the University of Wisconsin-Madison Men's and Women's Hockey Teams. The contract, identified as #22-5691, was initially effective from July 1, 2021. It includes automatic renewal extensions.
Posted Date
Jul 1, 2021
Due Date
Jun 30, 2026
Release: Jul 1, 2021
Close: Jun 30, 2026
This RFP is for hockey equipment and sponsorship for the University of Wisconsin-Madison Men's and Women's Hockey Teams. The contract, identified as #22-5691, was initially effective from July 1, 2021. It includes automatic renewal extensions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis