Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will include signage design and implementation services. The selected design-build firm shall provide complete design, fabrication, and installation services for all permanent signage, wayfinding, code, and environmental graphic elements associated with the arena renovation. The signage program must integrate seamlessly with the architectural design by populous architects and the town of vail s branding standards.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Upgrade electrical gear at Centennial ice arena.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close: Feb 9, 2026
Upgrade electrical gear at Centennial ice arena.
AvailableWaukesha County seeks engineering/refrigeration consulting services to evaluate replacement options for the existing R-22 refrigeration system at Eble Ice Arena and develop a formal recommendation. The consultant will prepare conceptual design documents and bid‑ready construction specifications for a 2027 procurement with construction planned for 2028. At the County’s discretion, the awarded firm may also provide construction management for the subsequent construction phase.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Waukesha County seeks engineering/refrigeration consulting services to evaluate replacement options for the existing R-22 refrigeration system at Eble Ice Arena and develop a formal recommendation. The consultant will prepare conceptual design documents and bid‑ready construction specifications for a 2027 procurement with construction planned for 2028. At the County’s discretion, the awarded firm may also provide construction management for the subsequent construction phase.
The State of Utah Division of Facilities Construction and Management (DFCM) solicits bids from prequalified general contractors to remodel University Village Building 3 at Weber State University in Ogden, Utah. Work includes repainting, new LVT and carpet flooring, kitchen millwork replacement, new dishwashers, partial ceiling tile replacement, plumbing reruns, and owner-provided split HVAC system installation; the estimated construction budget is $1,000,000. The construction period is scheduled May 11, 2026 to August 3, 2026 and only contractors with a Stage I prequalification may bid.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
The State of Utah Division of Facilities Construction and Management (DFCM) solicits bids from prequalified general contractors to remodel University Village Building 3 at Weber State University in Ogden, Utah. Work includes repainting, new LVT and carpet flooring, kitchen millwork replacement, new dishwashers, partial ceiling tile replacement, plumbing reruns, and owner-provided split HVAC system installation; the estimated construction budget is $1,000,000. The construction period is scheduled May 11, 2026 to August 3, 2026 and only contractors with a Stage I prequalification may bid.
Project involves a remodel of approx 14,000 SF. It includes new finishes in the corridors, media center, and selected offices. Work includes, but is not limited to, the following trades: selective demolition, hpl panels, acoustic grid ceilings, carpet, lvt, tile, tape, bed, paint, interior signage, fire sprinkler heads, hvac, plumbing, and electrical.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Project involves a remodel of approx 14,000 SF. It includes new finishes in the corridors, media center, and selected offices. Work includes, but is not limited to, the following trades: selective demolition, hpl panels, acoustic grid ceilings, carpet, lvt, tile, tape, bed, paint, interior signage, fire sprinkler heads, hvac, plumbing, and electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis