Closing soon

Weslaco Stake Suite Addition RFP

Description: Project consists of but not limited to addition to an existing lds stake center. Building addition is 1,300 SF on a 3AC site. Trades include but are not limited to the following: surveying, concrete (foundations & paving), masonry (brick, cmu, stone,), metal fabrications, railings, rough carpentry (wood framing), interior finish carpentry, millwork, insulation, air barriers, EIFS, roofing (shingles), joint sealants, doors, storefronts, windows, mirrors/glazing, louvers, drywall, tile, act, wallcoverings, paint, draperies, shelving, countertops, steeples, fire sprinklers, plumbing, hvac, electrical, av & data, fire alarms, earthwork, erosion controls, rigid paving, striping, landscaping.

Released
Nov 24, 2026
Closes
Dec 11, 2026(14 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts