Closing soon

Well Replacement at Lac Qui Parle Project shop site - Saint Paul RFP

Description: Well replacement. he Contractor will drill a well with a 5" PVC casing within 30 feet of the current well. The new well must connect to the existing waterline between the old well and the office building (underground), include new buried wiring from the well to new regulator/controls inside the shop building. Well will be connected to existing single phase electrical service. The Contractor is responsible for connecting the new well to the existing 1.25 inch copper waterlines and replace the pressure tank. The new pressure tank must be sized appropriately for the system, and the system as a whole must be installed to meet or exceed all local, State, and Federal codes. The new pressure tank must have at least a 7-year limited factory warranty. All existing 1-1/4" galvanized plumbing within vicinity of the pressure tank shall be replaced with 1-1/4" brass. Existing 1-1/4" brass check valve will be replaced with similar quality, configured in a vertical position to be easily replaceable. The brass plumbing will be configured to include a 1-1/4" brass tank tee with union for easy removal and replacement of the pressure tank, switch, gauge and hose bibb. The brass plumbing must include a new 1-1/4" brass 1/4 turn ball valve after the pressure tank to shut off water to the facility.

Buyer
Released
Oct 9, 2026
Closes
Oct 22, 2026(9 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts