Well Maintenance, Well Rehabilitation, and Capacity Improvement (RFP)
Engineering and water well services for three (3) wells and one (1) well under construction. Phase I: Initial Diagnostic Inspection: Perform down-hole camera inspections, specific capacity testing, and comprehensive water quality testing to establish baselines. Phase II: Well Rehabilitation and Well Capacity Mechanically and chemically clean the aquifer’s natural pores to remove blockages and scale build-up. Disinfect the wells and sanitize the pumps, casings, and surrounding equipment. Phase III: Long-Term Preventive Maintenance Implement a 5-year preventative maintenance plan through 2031, featuring scheduled performance benchmarking, scaling controls, and preventive electrical/mechanical/chemical tune-ups.