Well 10, Well 11 & Well 12 - MCC Replacement RFP
Project consists of demolition of the existing soft starter/mcc section that powers the existing 200 hp well pump at well sites 10, 11, and 12 each. Provide new standalone reduced voltage soft starter (rvss) for existing 200 hp well pump at well site, 10, 11, and 12 each as indicated on drawings. Provide required cable and conduit to complete the installation of the new soft starter, and commissioning of the work.