Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work involves extending Domestic Drinking Water Wells: #39, #45, and #47. Well #39 will be extended 40 LF using 8" column pipe T&C .279, 2.5" by 1.25" tube, and shaft. Well #45 will be extended 60 LF using NSF 61 epoxy coated 10" column pipe .279, 2.5" by 1.5" NSF-61 epoxy coated tube, and shaft. Well #47 will be extended 60 feet using NSF 61 epoxy-coated 10" column pipe .279, 2.5" by 1.5" NSF-61 epoxy-coated tube, and shaft.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
AvailablePremium
Access the largest public sector contact database
Phase I of this project includes the following Work: Phase I - Well No. 4 Rehabilitation, including but not limited to: Complete Replacement of Well No. 4 well casing and Screens with new 304 ss casing and screens to include Acid Clean and Air Burst Technology Already Completed: Installation of 375 GPM Submersible Turbine Test Well Pump and performance of 24-hour Drawdown Test of rehabilitated well to determine ultimate Well Yield; Performance of full Bacteriological Analysis, Inorganic Chemical Analysis, Radiological Analysis, Volatile Organic Compound Analysis, Synthetic Organic Compound Analysis.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Phase I of this project includes the following Work: Phase I - Well No. 4 Rehabilitation, including but not limited to: Complete Replacement of Well No. 4 well casing and Screens with new 304 ss casing and screens to include Acid Clean and Air Burst Technology Already Completed: Installation of 375 GPM Submersible Turbine Test Well Pump and performance of 24-hour Drawdown Test of rehabilitated well to determine ultimate Well Yield; Performance of full Bacteriological Analysis, Inorganic Chemical Analysis, Radiological Analysis, Volatile Organic Compound Analysis, Synthetic Organic Compound Analysis.
AvailableWell #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableWork consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
Posted Date
Sep 22, 2025
Due Date
Jan 8, 2026
Release: Sep 22, 2025
Close: Jan 8, 2026
Work consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis