Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Snow Hill
Phase I of this project includes the following Work: Phase I - Well No. 4 Rehabilitation, including but not limited to: Complete Replacement of Well No. 4 well casing and Screens with new 304 ss casing and screens to include Acid Clean and Air Burst Technology Already Completed: Installation of 375 GPM Submersible Turbine Test Well Pump and performance of 24-hour Drawdown Test of rehabilitated well to determine ultimate Well Yield; Performance of full Bacteriological Analysis, Inorganic Chemical Analysis, Radiological Analysis, Volatile Organic Compound Analysis, Synthetic Organic Compound Analysis.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Parkton
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
Posted Date
Oct 6, 2025
Due Date
Dec 4, 2025
Release: Oct 6, 2025
Town of Parkton
Close: Dec 4, 2025
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
AvailableTown of Carolina Beach
Project consists of the furnishing of all materials, labor and equipment to install a 3rd vertical pressure filter (10') in the existing Alabama Avenue water treatment plant, which includes all piping, valves and a triplex electrical control panel. The project also includes the installation of a raw water well #15, well pump, prefabricated building, interior piping, valves, meter, approximately 1,250 LF of 6" raw water pipe, 8" directional drill, emergency generator and electrical controls.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Town of Carolina Beach
Close: Dec 18, 2025
Project consists of the furnishing of all materials, labor and equipment to install a 3rd vertical pressure filter (10') in the existing Alabama Avenue water treatment plant, which includes all piping, valves and a triplex electrical control panel. The project also includes the installation of a raw water well #15, well pump, prefabricated building, interior piping, valves, meter, approximately 1,250 LF of 6" raw water pipe, 8" directional drill, emergency generator and electrical controls.
AvailableNapa Sanitation District
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Napa Sanitation District
Close: Jan 13, 2026
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
AvailableSacramento County, Water Resources Dept. (Sacramento County Water Agency)
Work includes brush and bail 40 hr, post rehab video 1 ls, vertical turbine pump nsf 61 certified 1 ls, uncoated water lube 10" column pipe 160 lf, sounding tube 1 ls.
Posted Date
Nov 5, 2025
Due Date
Nov 20, 2025
Release: Nov 5, 2025
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
Close: Nov 20, 2025
Work includes brush and bail 40 hr, post rehab video 1 ls, vertical turbine pump nsf 61 certified 1 ls, uncoated water lube 10" column pipe 160 lf, sounding tube 1 ls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis