Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a well collection line system that will connect the existing ground water wells and be built to public drinking water standards includes 1,449 LF of 6" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances; 109 lf of trenchless construction of 6" waterline, awwa c- 900 fusible pvc pipe, including access pits and appurtenances, complete in place; 8,162 LF of 8" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances with standard bedding and backfill, complete in place. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include approx 3,920 LF of 8" pvc water line; 3,590 LF of 8" pvc gravity sanitary sewer; 580 LF of 36"-60" of pp storm sewer and 2,720 LF of 24"-54" rcp storm sewer.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Work include approx 3,920 LF of 8" pvc water line; 3,590 LF of 8" pvc gravity sanitary sewer; 580 LF of 36"-60" of pp storm sewer and 2,720 LF of 24"-54" rcp storm sewer.
AvailableNorthwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Posted Date
Dec 28, 2025
Due Date
Jan 23, 2026
Release: Dec 28, 2025
Close: Jan 23, 2026
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
AvailableWater well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Water well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis