Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include approx 3,920 LF of 8" pvc water line; 3,590 LF of 8" pvc gravity sanitary sewer; 580 LF of 36"-60" of pp storm sewer and 2,720 LF of 24"-54" rcp storm sewer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of detention basin grading, installation of water distribution, sanitary collection, paving, and storm sewer and offsite gravity sanitary system to serve teal gardens, which is a single-family development consisting of 105 lots and approximately 21 acres.
Posted Date
Dec 14, 2025
Due Date
Jan 15, 2026
Release: Dec 14, 2025
Close: Jan 15, 2026
Project consists of detention basin grading, installation of water distribution, sanitary collection, paving, and storm sewer and offsite gravity sanitary system to serve teal gardens, which is a single-family development consisting of 105 lots and approximately 21 acres.
AvailableWork includes 9,090 CY of roadway excavation - on-site disposal on stripped (4" minimum depth) and proof-roll tested areas; 3,329 CY of lot manipulation/excavation; 1,000 CY of over excavation (remove and replace soil below the top of subgrade elevation); 5,956 SY of 8" stabilized subgrade preparation (furnish and install, complete in place); 6,831 SY of 6" reinforced concrete pavement; 30 LF of 6", sch-40 pvc irrigation/electrical sleeve; 30 LF of 4", sch-40 pvc irrigation/electrical sleeve; see attached files.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
Work includes 9,090 CY of roadway excavation - on-site disposal on stripped (4" minimum depth) and proof-roll tested areas; 3,329 CY of lot manipulation/excavation; 1,000 CY of over excavation (remove and replace soil below the top of subgrade elevation); 5,956 SY of 8" stabilized subgrade preparation (furnish and install, complete in place); 6,831 SY of 6" reinforced concrete pavement; 30 LF of 6", sch-40 pvc irrigation/electrical sleeve; 30 LF of 4", sch-40 pvc irrigation/electrical sleeve; see attached files.
AvailableProject scope shall include the installation of approx. 5,110 LF of 8" PVC water line; 3,650 LF of 8" PVC gravity sanitary sewer; 3,100 LF of 24"-48" RCP storm sewer; 13,490 SY of 6" reinforced concrete pavement.
Posted Date
Jan 9, 2026
Due Date
Jan 28, 2026
Release: Jan 9, 2026
Close: Jan 28, 2026
Project scope shall include the installation of approx. 5,110 LF of 8" PVC water line; 3,650 LF of 8" PVC gravity sanitary sewer; 3,100 LF of 24"-48" RCP storm sewer; 13,490 SY of 6" reinforced concrete pavement.
AvailableHarris County Municipal Utility District No. 533 is soliciting sealed bids for the construction of water, sanitary sewer, storm sewer facilities, and reinforced concrete paving for Elyson, Section 70. The project scope includes installation of 8-inch water and sanitary sewer lines, 24- to 66-inch storm sewer, subgrade preparation, reinforced concrete pavement, and curbs with lot grading. Bids are received by BGE, Inc. or electronically via CivCast per the Invitation to Bidders.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Harris County Municipal Utility District No. 533 is soliciting sealed bids for the construction of water, sanitary sewer, storm sewer facilities, and reinforced concrete paving for Elyson, Section 70. The project scope includes installation of 8-inch water and sanitary sewer lines, 24- to 66-inch storm sewer, subgrade preparation, reinforced concrete pavement, and curbs with lot grading. Bids are received by BGE, Inc. or electronically via CivCast per the Invitation to Bidders.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →