Work consists of replace Well 16 within the Carillion Water Treatment Plant (WTP) and target a new Aquafer. These upgrades would include construction of a production well, booster pump station, and storage tank.
Work consists of replace Well 16 within the Carillion Water Treatment Plant (WTP) and target a new Aquafer. These upgrades would include construction of a production well, booster pump station, and storage tank.
Work consists of the following major items: construction of a 1.58 mgd pfas water treatment plant (wtp) housing pfas filter vessels at the existing oak street WTP facility site. The new building will be approximately 5,376 SF constructed of masonry walls, precast columns, precast plank roof, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. Modified and new site piping, site work for drainage, water, sewer, electrical, and all site/civil improvements. Related work to integrate the new building with the existing WTP facility including but not limited to piping, masonry, chemical feed, electrical and SCADA, as well as all associated appurtenances. Construction of an approx 450 SF building addition for chemical feed system improvements at the existing WTP building.
Sebastopol Water Association, Inc. is requesting sealed bids for Contract III: 500 GPM Water Well and Upgrades to Existing Well (rebid) as part of distribution system improvements in Sebastopol, Mississippi. Bids will be received at the NTS Office, 299 Hwy 492, Sebastopol, MS 39359 until Thursday, April 16, 2026 at 2:00 PM local time, when they will be publicly opened and read. The project includes constructing a 500 GPM water well at the existing Mills Rd. Tank Site and related upgrades, with an anticipated duration of roughly 280 days and compliance with American Iron and Steel requirements.
Sebastopol Water Association, Inc. is requesting sealed bids for Contract III: 500 GPM Water Well and Upgrades to Existing Well (rebid) as part of distribution system improvements in Sebastopol, Mississippi. Bids will be received at the NTS Office, 299 Hwy 492, Sebastopol, MS 39359 until Thursday, April 16, 2026 at 2:00 PM local time, when they will be publicly opened and read. The project includes constructing a 500 GPM water well at the existing Mills Rd. Tank Site and related upgrades, with an anticipated duration of roughly 280 days and compliance with American Iron and Steel requirements.
Request for Bids for the construction of the Lincoln Street Well Treatment Upgrades project, including a 3,300 square foot building with greensand and granular activated carbon filtration vessels, backwash storage tanks, pumps, chemical feed modifications, and associated site infrastructure and demolition of the existing well building.
Request for Bids for the construction of the Lincoln Street Well Treatment Upgrades project, including a 3,300 square foot building with greensand and granular activated carbon filtration vessels, backwash storage tanks, pumps, chemical feed modifications, and associated site infrastructure and demolition of the existing well building.
Available
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Work consists of the following major items: construction of a 1.58 mgd pfas water treatment plant (wtp) housing pfas filter vessels at the existing oak street WTP facility site. The new building will be approximately 5,376 SF constructed of masonry walls, precast columns, precast plank roof, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. Modified and new site piping, site work for drainage, water, sewer, electrical, and all site/civil improvements. Related work to integrate the new building with the existing WTP facility including but not limited to piping, masonry, chemical feed, electrical and SCADA, as well as all associated appurtenances. Construction of an approx 450 SF building addition for chemical feed system improvements at the existing WTP building.