Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Hunterdon Area Energy Cooperative
Clarifier no. 2: removal and replacement of the catwalk and drive platform, removal and replacement of the clarifier internals, replacement of the scum baffle and weir plates, rehabilitation of the tank concrete, and replacement of all related electrical equipment.
Posted Date
Apr 15, 2026
Due Date
May 19, 2026
Release: Apr 15, 2026
Hunterdon Area Energy Cooperative
Close: May 19, 2026
Clarifier no. 2: removal and replacement of the catwalk and drive platform, removal and replacement of the clarifier internals, replacement of the scum baffle and weir plates, rehabilitation of the tank concrete, and replacement of all related electrical equipment.
AvailableHunterdon Area Energy Cooperative
The work will include but is not limited to the installation of approx., 879 LF of twelve-inch (12") ductile iron piping (DIP), approx., 225 LF of twelve-inch (12") DIP, as well as approx., 113 LF of four four-inch (4") DIP.
Posted Date
Sep 17, 2025
Due Date
Oct 22, 2025
Release: Sep 17, 2025
Hunterdon Area Energy Cooperative
Close: Oct 22, 2025
The work will include but is not limited to the installation of approx., 879 LF of twelve-inch (12") ductile iron piping (DIP), approx., 225 LF of twelve-inch (12") DIP, as well as approx., 113 LF of four four-inch (4") DIP.
Hunterdon Area Energy Cooperative
Work includes mobilization 1 LS; environmental protection and restoration 1 LS; maintenance and protection of traffic 1 LS; exploratory test pits 5 CY; rock excavation 33 CY; utility pole bracing system 5 EA; dense grade aggregate 330 CY; hot mix asphalt 25M64 110 SY; 2" thick asphalt milling and paving hot mix asphalt 9.5m64 180 SY; hot mix asphalt 25M64 10 SY; 2" thick asphalt milling and paving hot mix asphalt 12.5M64 20 SY; sidewalk restoration 530 SF; concrete curb replacement 170 LF; 12" water main installation via bridge attachmentt - includes abutment modification, existing 8" water main and hanger removal, and installation of new 12" main and hangers, complete 1 LS. See attached file.
Posted Date
Aug 26, 2025
Due Date
Sep 30, 2025
Release: Aug 26, 2025
Hunterdon Area Energy Cooperative
Close: Sep 30, 2025
Work includes mobilization 1 LS; environmental protection and restoration 1 LS; maintenance and protection of traffic 1 LS; exploratory test pits 5 CY; rock excavation 33 CY; utility pole bracing system 5 EA; dense grade aggregate 330 CY; hot mix asphalt 25M64 110 SY; 2" thick asphalt milling and paving hot mix asphalt 9.5m64 180 SY; hot mix asphalt 25M64 10 SY; 2" thick asphalt milling and paving hot mix asphalt 12.5M64 20 SY; sidewalk restoration 530 SF; concrete curb replacement 170 LF; 12" water main installation via bridge attachmentt - includes abutment modification, existing 8" water main and hanger removal, and installation of new 12" main and hangers, complete 1 LS. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Hunterdon Area Energy Cooperative's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database