Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The general description of work includes: Site improvements (demolition, grading, paving, fencing), installation of a well pump, discharge piping, modification of chlorination and fluoridation systems, HVAC, building upgrades (floor, roof, doors), sewer lateral, and electrical/controls (PLC, SCADA), and all labor and any other items necessary for a fully functional municipal water well.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This IFB solicits contractors to abandon and demolish existing irrigation pipeline components and install a new 18" PVC pipeline including new standpipes, concrete structures, delivery gates, and air vents to replace the Booster 33/Well 22 pipeline. The Engineer's Estimate is approximately $1,935,000 and work is expected to be completed within 240 calendar days from Notice to Proceed.
Posted Date
Dec 1, 2025
Due Date
Dec 23, 2025
Release: Dec 1, 2025
Close: Dec 23, 2025
This IFB solicits contractors to abandon and demolish existing irrigation pipeline components and install a new 18" PVC pipeline including new standpipes, concrete structures, delivery gates, and air vents to replace the Booster 33/Well 22 pipeline. The Engineer's Estimate is approximately $1,935,000 and work is expected to be completed within 240 calendar days from Notice to Proceed.
Premium
Access the largest public sector contact database
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
AvailableWell #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableProvide well drilling services.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Provide well drilling services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis