Illinois Capital Development Board
State AgencyIL
Posted
-
Oct 6, 2026
Communication Building Renovation/Addition
Work includes communication building renovation/addition.
Description: Work inlcudes weightroom addition and locker renovation.
SchoolDistrict · MO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Illinois Capital Development Board
State AgencyIL
Posted
-
Oct 6, 2026
Work includes communication building renovation/addition.
School DistrictNE
Posted
Aug 27, 2026
Sep 22, 2026
Project consists of a 365sf addition to the existing public school building, along with approximately 3,300 SF of renovation to existing classroom, conference room, and administrative spaces. The new addition consists of a new reception area and a modified entry vestibule to create a safe, secure entry point into the building. Additional work includes upgraded hvac systems in the welding/cte and cnc areas (approximately 1980SF).
School DistrictKY
Posted
Aug 11, 2026
Sep 10, 2026
Work to include, but not limited to: site excavation, landscaping, asphalt, cast-in-place concrete, structural steel, CMU, brick masonry, metal panels, EPDM roofing, spray applied acrylic coating, interior finishes, casework, electric, plumbing, HVAC, fire alarm, metal stud framing, gypsum sheathing overhead coiling doors, and acoustical ceilings.
Alabama Community College System
Higher EducationAL
Posted
-
Oct 13, 2026
Renovations, upgrades, and addition to an aviation college facility, including a new 8,000 SF pre-engineered hangar building, LED lighting upgrades, plumbing, interior improvements, new paving, and storm system installation.
Decision makers connected to this RFP from Marion County School District R-2.