Reid Road Municipal Utility District 2
Special DistrictTX
Aug 7, 2026
Closes
Aug 26, 2026
Lift Station No. 4 Rehabilitation to Serve Reid
Project consists of rehabilitation of lift station no. 4.
Description: Provide the construction of a submersible wastewater lift station including 10' diameter pre-cast concrete wet well with valve pad, three (3) 739 gpm submersible pumps and all associated pipe, valves and fittings.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Reid Road Municipal Utility District 2
Special DistrictTX
Aug 7, 2026
Closes
Aug 26, 2026
Project consists of rehabilitation of lift station no. 4.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Lift station construction. Project generally consists of the following key elements: construction of site-built cast-in-place lift station concrete structure and associated masonry. Site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent to the Lincoln lift station - package 1 project. Installation of mechanical piping, valving, force mains, to and from the lift station. Installation of mechanical piping, valving, force mains internal to the lift station. Installation of fusion welding (HDPE); see attached file.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Lift station construction. Project generally consists of the following key elements: construction of site-built cast-in-place lift station concrete structure and associated masonry. Site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent to the Lincoln lift station - package 1 project. Installation of mechanical piping, valving, force mains, to and from the lift station. Installation of mechanical piping, valving, force mains internal to the lift station. Installation of fusion welding (HDPE); see attached file.