Summary
Work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer Repairs: 1) Replace the riser manway. 2) Replace the wet interior roof hatch. 3) Replace the sample tap on the fill/draw pipe in the pit. 4) Overflow discharge modification. 5) Replace overflow pipe support above the balcony. 6) Remove the top of the fall prevention device on the leg ladder. 7) Install a roof platform. 8) Install a wet interior ladder. 9) Replace the missing cleat in the wet interior. 10) Install a swing gate at the balcony opening. 11) Install cathodic clips and pressure fitting. 12) Weld steel plates over the cathodic lift holes. 13) Install a roof handrail with a painter’s railing. 14) Relocate the antennas to the roof handrail. 15) Install bowl rigging couplings. 16) Repair damaged electrical conduit/junction boxes. 17) Relocate the aviation light. 18) Install grounding rods for the structure.