CityTX
Posted
Nov 20, 2026
Dec 17, 2026
Description: Construction of the City of Farmers Branch Water & Wastewater System 2026 Capital Improvements Plan Phase 3, consisting primarily of installing new water mains and sanitary sewer mains, various service reconnections and manholes, and replacement of pavement and appurtenances. The work includes open-cut installation of multiple sizes of PVC water lines (including approximately 4,213 LF of 8-inch and 1,506 LF of 12-inch), sanitary sewer work by pipe bursting and open cut (including approximately 2,152 LF of 12-inch by pipe bursting and 1,611 LF of 12-inch SDR 26 PVC by open cut), construction of 26 five-foot diameter manholes and roughly 4,171 SY of 10-inch reinforced concrete pavement, plus related traffic control, erosion control, and testing. The procurement requires certified bonds (performance, payment, maintenance), specified insurance and prevailing wage compliance, a 180-calendar-day construction period, and adherence to the contract documents and addenda process.
City · TX, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
304 days before RFP
City staff proposed a three-phase FY2026 water and wastewater replacement program, including four wastewater projects and a larger water-line project in phase three, with construction hoped for later in 2026.
again prioritizing all those water waste waters based on the criterias that I just mentioned. So, that is now completed and we're what I'm bringing here before you is kind of an overview of the first year that we're going to tackle in. Uh, so we came up with the for the 2026 CIP plan, we've identified the ones that need to go first. So for this one, since…
City Council Study Session
Board meeting · Jan 20, 2026
Board meeting
226 days before RFP
Farmers Branch Public Works reported that its consultant was designing the 2026 water and wastewater replacement program, including more than 19,000 feet of water-main replacement and a 16-inch transmission main.
uh we are currently design with our consultant for our 2026 CIP water and wastewater infrastructure replacements. We've got a little over 19,000 ft of water being replacement for this year. It's going to be again various sizes and um materials 6 to 12 in. We also have 116in transmission main that's going to be replaced as well. Uh that's going to
Farmers Branch Sustainability Committee Sustainability Committee Meeting
Board meeting · Apr 8, 2026
Board meeting
157 days before RFP
The proposed FY 2026-27 budget increased the water/wastewater system allocation from $9 million to $12.8 million.
Perfect. And then some of the priorities that we've addressed thus far, you'll see on the top left hand part of your screen is the pedestrian traffic improvements allocating $1.8 8 million towards that initiative as well as the infrastructure needs that that will be addressed on the right hand portion of your screen. The um increasing our allocation towards…
Farmer Springs City Council Study Session
Board meeting · Jun 16, 2026
Board meeting
31 days before RFP
City staff proposed considering a 20-year-to-25/30-year extension while reporting approximately $71.5 million of outstanding water and wastewater infrastructure needs in the plan's first five-year period.
Council, we currently have two areas tonight which we are seeking your feedback upon. First, to the right slide. First is the duration or the timeline of the water wastewater replacement plan itself. Currently, our city has a 20-year water wastewater replacement plan broken down into 5-year increments. Based on the most recent rate study, it was determined…
Farmers Branch City Council Study Session
Board meeting · Oct 20, 2026
RFP published
Proposals due (24 days left)
Adjacent opportunities open for bidding right now.
CityTX
Posted
Nov 20, 2026
Dec 17, 2026
Decision makers connected to this RFP from City of Farmers Branch.
Project Name: PW279901 - Utility Replacement & Improvements Public Works Prior Yrs 26/27 27/28 28/29 29/30 30/31 31/32 Total 61,557,597$ 12,800,000$ 15,200,000$ 12,400,000$ 12,700,000$ 12,500,000$ 12,500,000$ 139,657,597$ Scope: Justification: Project Appropriations: Design - Construction 61,557,597 Acquisition - Total 61,557,597$ Project Funding: Transfer…
City of Farmers Branch FY2026-27 Proposed Budget
Proposed budget · Oct 1, 2025
Construction of water and sanitary sewer improvements including long runs of new PVC water mains (open cut and encased bore), replacement and pipe-bursting of sanitary sewer mains, installation of new manholes, and reconstruction of concrete pavement and appurtenances. Work includes both open-cut and trenchless (pipe bursting) methods, reconnecting existing service laterals, performing material testing, and providing traffic control and erosion/stormwater measures. The contract requires bonding, insurance, and adherence to specified standards and schedule, with construction anticipated in early 2027 and a 180-calendar-day completion period for the work.
Bear Valley-Franklin County Joint (Water) Authority
Special DistrictPA
Posted
-
Dec 2, 2026
work includes approx 43,000 LF of 4" through 16" waterline, including gate valves, air release valve assemblies, fire hydrants, 300 water service connections and all associated appurtenances.
CityIL
Posted
-
Dec 15, 2026
The work shall generally consist of: Wastewater Treatment Plant Improvements to include a new headworks, new activated sludge treatment system, new operational building, new sludge dewatering system, rehabilitated lagoons and site improvements.
Posted
Nov 12, 2026
Dec 1, 2026
Work includes approx 2,640 LF of 18" SDR-26 gravity sanitary sewer; 50 LF of jack & bore - 30" casing (drain no. 28); 1,200 LF of 16" water transmission main replacement; 4,000 LF of concrete curb removal/replacement; 5,000 TN of HMA pavement (driveways, pathway, road) maintenance of traffic; sanitary sewer flow bypass pumping and pump and haul operations; incidental cross culvert and storm sewer removal/replacement/repair; turf and landscaping restoration; including all necessary appurtenances and restoration.