Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will consist of the replacement of existing water lines with a new 8" water main inside the Town limits. Included will be all connections, service lines, hydrants, valves, appurtenances and surface replacements. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Oct 15, 2025
Close: Jan 14, 2026
Street improvements services.
AvailableWork consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableContract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis