Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide a complete roof system package based on the project specifications which include a 20-year, fully adhered EPDM roof system with polyisocyanurate insulation and required flashings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work of this contract generally includes construction of water treatment plant expansion consisting of two deep bed dual media filters, pipe gallery, electrical gear upgrades, underground concrete disinfection contact basin, and associated site piping modifications. These improvements will include excavation, subgrade preparation, and construction of a facility expansion as well as the installation of various site piping, butterfly valves, and associated fittings, electrical gear, filter control panel and associated valves and instrumentation, and associated site electrical work, underground concrete disinfection contact basin, and site restoration and seeding.
Posted Date
Oct 23, 2025
Due Date
Feb 11, 2026
Release: Oct 23, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 11, 2026
The work of this contract generally includes construction of water treatment plant expansion consisting of two deep bed dual media filters, pipe gallery, electrical gear upgrades, underground concrete disinfection contact basin, and associated site piping modifications. These improvements will include excavation, subgrade preparation, and construction of a facility expansion as well as the installation of various site piping, butterfly valves, and associated fittings, electrical gear, filter control panel and associated valves and instrumentation, and associated site electrical work, underground concrete disinfection contact basin, and site restoration and seeding.
AvailableConstruct new water treatment plant.
Posted Date
Jan 1, 2026
Due Date
Feb 13, 2026
Release: Jan 1, 2026
Close: Feb 13, 2026
Construct new water treatment plant.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Feb 24, 2026
Release: Nov 24, 2025
Close: Feb 24, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.
AvailableWork includes replacement of roof on the water treatment plant facility.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Work includes replacement of roof on the water treatment plant facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →