Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes: Furnish and install a sodium hypochlorite generation system; install associated piping, valves, fittings, supports, and connections required for proper operation of system; electrical equipment, including power distribution, wiring, and grounding; integration and installation of control systems, including programmable logic controller (PLC), human machine interface (HMI), instrumentation, and associated control hardware and software; and coordination of system integration with existing plant systems, as required; testing, start-up, commissioning, and functional verification of installed system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Rocky Mountain E-Purchasing System lists a solicitation for the Mill Creek Water Treatment Plant Chlorine Conversion Project in Telluride, Colorado. The opportunity was published on January 23, 2026 and seeks bids for chlorine conversion work at the Mill Creek Water Treatment Plant. Bids are due by February 20, 2026 at 3:00 PM MST via the BidNet portal.
Posted Date
-
Due Date
Feb 20, 2026
Close: Feb 20, 2026
The Rocky Mountain E-Purchasing System lists a solicitation for the Mill Creek Water Treatment Plant Chlorine Conversion Project in Telluride, Colorado. The opportunity was published on January 23, 2026 and seeks bids for chlorine conversion work at the Mill Creek Water Treatment Plant. Bids are due by February 20, 2026 at 3:00 PM MST via the BidNet portal.
AvailableWork includes mass grading of the site to accommodate a future 40 million gallons per day (mgd) water treatment plant (wtp), mass grading of the existing site per the 40 mgd layout; erosion and sedimentation control; site work demolition; yard structure demolition; detention pond construction; site restoration.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Work includes mass grading of the site to accommodate a future 40 million gallons per day (mgd) water treatment plant (wtp), mass grading of the existing site per the 40 mgd layout; erosion and sedimentation control; site work demolition; yard structure demolition; detention pond construction; site restoration.
Work includes construction of a new water treatment plant (wtp) adjacent to the existing wtp. The new wtp generally consists of the following items: site preparation, site piping, wtp building, pressure filters, high service pumps, chlorine gas system, chlorine contact tanks, electrical, permanently mounted diesel generator and ats, site restoration, and all other ancillary and supporting items to make a complete operational wtp system.
Posted Date
Jan 13, 2026
Due Date
Feb 10, 2026
Release: Jan 13, 2026
Close: Feb 10, 2026
Work includes construction of a new water treatment plant (wtp) adjacent to the existing wtp. The new wtp generally consists of the following items: site preparation, site piping, wtp building, pressure filters, high service pumps, chlorine gas system, chlorine contact tanks, electrical, permanently mounted diesel generator and ats, site restoration, and all other ancillary and supporting items to make a complete operational wtp system.
Work consists of water treatment plant intake cleaning and repairs.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Work consists of water treatment plant intake cleaning and repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis