Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work contract of repair of the underground clearwell water storage tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
AvailablePremium
Access the largest public sector contact database
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
AvailableDesign and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableConstruction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.