Summary
The project includes the replacement and new installation of waterlines using open trench, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 388 LF of 6" c-900-dr-18 PVC pipe, 4,905 LF of 8" c-900-dr-18 PVC pipe, 6,721 LF of 12" c-900-dr-18 PVC pipe, and 2,997 LF of 14" c-900-dr-18 PVC pipe, and an approx. 220 LF of 12" c-900 dr-18 FPVC waterlines installed by horizontal directional drilling. The replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement.