Summary
Work includes 1 LS stormwater management plan (swmp) and erosion and sediment control (e&sc) plan (1 ls); 2,103 LF c900 dr18 PVC water line2 EA 4" dia gate valves and pueblo riser box; 2,103 LF class "b" bedding extending from 6" below to 12" above the pipe for water line installations; 1 EA 4" in-line connection between new and existing water mains and plugging existing mains; 1 EA 2" blowoff assembly on new water main; 29 EA 3/4" service tap for new 4" PVC water main; water service line and connections; 200 LF 3/4" HDPE service line between the new corporation stop and connection to the existing service line through open trench installation. See attached bid ad.