Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes ultrasonic master meter, 20 hp booster pump skid, booster pump building enclosure installation, booster pump station installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
Premium
Access the largest public sector contact database
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
AvailableIncrease the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableThe project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.