Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Stanton
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Stanton
This project includes site preparation and installation of one (1) 200,000-GAL standpipe water storage tank and other appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 10, 2025
Release: Nov 21, 2025
City of Stanton
Close: Dec 10, 2025
This project includes site preparation and installation of one (1) 200,000-GAL standpipe water storage tank and other appurtenances.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Krum
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
City of Krum
Close: Dec 2, 2025
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
AvailableCity of Stanton
work includes approx 11,265 LF of water line; 310 LF of utility crossing/parallel installation; 290 LF of multiple bore and jacks, two directional bore, and other associated appurtenances and related work.
Posted Date
-
Due Date
Dec 10, 2025
City of Stanton
Close: Dec 10, 2025
work includes approx 11,265 LF of water line; 310 LF of utility crossing/parallel installation; 290 LF of multiple bore and jacks, two directional bore, and other associated appurtenances and related work.
AvailableMontgomery Water Works and Sanitary Sewer Board
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Montgomery Water Works and Sanitary Sewer Board
Close: Dec 18, 2025
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.