Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Casa Grande, Arizona, is seeking bids for security upgrades at its Water Reclamation Facility. The project involves the procurement, installation, integration, and testing of security systems, including access control panels, CCTV cameras, door and vehicle gate security hardware, and area lighting. Contractors must demonstrate relevant experience and certifications, including being a Verkada Gold Partner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Donax water reclamation facility post hurricane ian repairs & hardening
Posted Date
Nov 17, 2025
Due Date
Feb 5, 2026
Release: Nov 17, 2025
Close: Feb 5, 2026
Donax water reclamation facility post hurricane ian repairs & hardening
AvailableCity of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
City of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
AvailableProject consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
Posted Date
Jan 7, 2026
Due Date
Feb 18, 2026
Release: Jan 7, 2026
Close: Feb 18, 2026
Project consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
Posted Date
Dec 30, 2025
Due Date
Feb 12, 2026
Release: Dec 30, 2025
Close: Feb 12, 2026
Project consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
Available