CityGA
Posted
Aug 10, 2026
Sep 17, 2026
Sewerage System Improvements - Little River Water Pollution Control Plant
Work includes approx 3,600 LF DIP and PVC sewer by jack and bore, rock excavation, clearing, soil erosion and sediment control, include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building.