Water Treatment Plant MS/RO Chemical Area Recoating RFP
Work includes rehabilitation of existing chemical storage and containment areas, major work elements include demolition, disposal, surface preparation, and recoating of the existing ms/ro bulk chemical storage area; furnishing and installing a new chemical-resistant coating system within the bulk storage containment area; rehabilitation and recoating of the existing sump area; and replacement of the existing pump-out system, including associated piping, valves, electrical, controls, testing, and appurtenances required to provide a complete and operational system. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.