Virginia Department of Transportation
State AgencyVA
Posted
Sep 9, 2026
Oct 28, 2026
B18_2026 Bridge Recoating
Work include bridge recoating.
Description: Construction of the water plant recoating.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Virginia Department of Transportation
State AgencyVA
Posted
Sep 9, 2026
Oct 28, 2026
Work include bridge recoating.
School DistrictMT
Posted
Sep 30, 2026
Oct 5, 2026
Conrad Public Schools is seeking sealed bids for the materials and labor needed to repair and recoat the Prairie View roof, which is approximately 27,770 square feet. Bids are due by 12:30 p.m. on October 5, 2026, at the District Administration Office at Prairie View School in Conrad, where they will be opened publicly; bidders must meet applicable Montana and federal requirements and hold a current Montana Public Contractor’s License and Department of Labor and Industry (Workman’s Comp) registration. On-site inspection and project details/documents are available at Conrad Public Schools, 220 N. Wisconsin Street, Conrad, Montana 59425.
Spring Creek Forest Public Utility District
Special DistrictTX
Posted
Sep 23, 2026
Oct 8, 2026
Spring Creek Forest Public Utility District is soliciting sealed bids for rehabilitation of Water Plant No. 2 in Montgomery County, Texas. The work includes demolishing the existing ground storage tank and foundation, installing a new 500,000-gallon tank and foundation, reconfiguring well-to-tank piping and chemical injection points, and recoating a 20,000-gallon hydropneumatic tank. Additional work includes painting the standby generator enclosure and control building, modifying the fence, regrading the site for drainage, and installing safety signage; bids are due October 8, 2026, at 10:00 a.m. local time.
Special DistrictMA
Posted
-
Oct 14, 2026
Project includes the construction of a new Water Treatment Plant, two-celled Chlorine Contact Tank, two-celled Clearwell, Finished Water Pumping Station, Spent Washwater Equalization Tank, a Generator, Stormwater BMPs and Yard Piping as well as rehabilitation of the existing Residuals Handling lagoons. The new Water Treatment Plant will be approx 190 by 77' and will consist of a process area with a pre-oxidation tank, three DAF units, and three filters. There will also be chemical rooms, and an administration area.