Retrieving RFP details
Release
Close
City of Everett
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
Bid Tab
Washington Suburban Sanitary Commission (WSSC)
Contract consists of the replacement of approx 85 FT of 6" water house connection, 440 FT of fire hydrant leads, 410 FT of 8" water house connection, 450" of 8" water main, 45 FT of 10" water house connection, 185 FT of 10" water main, 240 FT of 12" water main, 9,160 FT of 24" water main and 335 FT of water house connections.
City of Ocoee
Flewelling 2- inch water main replacement.
City of Naperville
Work generally includes the replacement of approx. 5,460 LF of aging and deficient water main.
Release
Apr 15, 2025
Close
Nov 18, 2025