Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of replacing approx 6,925 LF of water main. The water main will be constructed of ductile iron pipe ranging from 4" to 8" in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances. Work includes approx. 25 LF 4" DIP water main install, 42 EA 6" gate valve install, 3 EA new hydrant assembly install, 75 EA water service reconnection, 175 LF concrete curb replacement, 1,025 SF concrete sidewalk, 2,500 SY asphalt concrete mix intermediate pavement patching, 275 SY 1.5" depth cold planing of bituminous pavement, pavement marking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project work includes: Description of Work (Phase I): Replacement of approx. 1.51 miles of 8" through 12" water main. 0.7 miles of water house connections to serve Pepsi Place and nearby streets in the Cheverly area of Prince George’s County, Maryland; Description of Work (Phase II): Replacement of approx. 2.33 miles of 8" through 12" water main. 1.4 miles of water house connections to serve Crest Avenue and various streets in the Cheverly area of Prince George’s County, Maryland.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project work includes: Description of Work (Phase I): Replacement of approx. 1.51 miles of 8" through 12" water main. 0.7 miles of water house connections to serve Pepsi Place and nearby streets in the Cheverly area of Prince George’s County, Maryland; Description of Work (Phase II): Replacement of approx. 2.33 miles of 8" through 12" water main. 1.4 miles of water house connections to serve Crest Avenue and various streets in the Cheverly area of Prince George’s County, Maryland.
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableReplacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailableWork consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.