Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of SCADA system troubleshooting and repair, radio/RTU component troubleshooting and repair, field instrument troubleshooting, repair and recalibration, control panel component diagnosis, repair and component replacement, control and data conductor replacement and re-termination, computer and data network hardware troubleshooting and repair, software repair and upgrades and plc programming, update or corrections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide services to review and establish updated water and wastewater rates for the upcoming 5-year period (fy27 to fy32).
Posted Date
Jan 15, 2026
Due Date
Feb 6, 2026
Release: Jan 15, 2026
Close: Feb 6, 2026
Provide services to review and establish updated water and wastewater rates for the upcoming 5-year period (fy27 to fy32).
AvailableRemoval and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
Posted Date
Jan 15, 2026
Due Date
Feb 24, 2026
Release: Jan 15, 2026
Close: Feb 24, 2026
Removal and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
AvailableProject includes wastewater pump station instrumentation and communication service. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project includes wastewater pump station instrumentation and communication service. See outside link.
AvailableWork includes approx 1 LS polymer system, piping valves, electrical instrumentation; 1 LS chemical feed system.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
Work includes approx 1 LS polymer system, piping valves, electrical instrumentation; 1 LS chemical feed system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis