Mills Road Municipal Utility District
Special DistrictTX
Posted
-
Oct 8, 2026
Wastewater Treatment Plant Detention RFP
Work includes paved detention pond.
Description: Provide wastewater treatment plant emergency generator.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Mills Road Municipal Utility District
Special DistrictTX
Posted
-
Oct 8, 2026
Work includes paved detention pond.
CityVA
Posted
-
Oct 9, 2026
The Town of Front Royal is seeking bids for the design and construction of a new Centrifuge Building at its Wastewater Treatment Facility. The project includes a semi-enclosed truck bay, centrifuge, biosolids conveyors, polymer feed system, sludge pumps, piping, SCADA, controls, electrical, HVAC, and plumbing. This is an open construction Invitation for Bid, not a grant program, with bids due October 9, 2026, at 11:00 AM Eastern Time.
Special DistrictTX
Posted
-
Oct 16, 2026
New submersible lift station, new 40-foot diameter clarifier, new aeration basin, construction of a sludge transfer station, expansion of the chlorine contact basin, new elevated concrete platforms, new disinfection and dechlorination systems, and replacement of coarse bubble aeration system with fine bubble aeration system, including electrical controls, conduit, wiring and programming. Additional site work includes concrete pavement, perimeter fencing, grading, drainage, and detention. Alternate 1 - coat existing digester/thickener no. 1 and digester/thickener no. 2 (9,000 SF).
CityIL
Posted
Sep 18, 2026
Nov 12, 2026
Work includes: Demolition; Site Work; Construct New Garage, Laboratory, & Operations Building; Construct New Excess Flow Clarifiers; Construct New Screening Building; Preliminary Treatment Building Rehabilitation; Primary Clarifier Rehabilitation; Biological Process Improvement; Construct new A2O basins; Secondary Treatment Building Rehabilitation; Final Clarifier Rehabilitation; Construct New Advanced Treatment Building; Aerobic Digester Expansion and Upgrades; Sludge Handling Building Improvements.