Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide wastewater treatment and lift station improvements. Project includes construction of nitrOx system at the existing wastewater lagoon, flow control box, 286 LF of 8 DIP piping, access road, chlorination/dichlorination station, flow meter manhole, lift station, electrical service and components, generator and other miscellaneous work; lift station rehabilitation at three existing lift stations including removal of pumps, valves appurtenances and all electrical equipment, installation of new pumps, rails, floats, transducers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Constructing new wastewater lift station, new sanitary sewer force main, alteration of wastewater treatment lagoons, modifications to wastewater collection system, and miscellaneous other work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Constructing new wastewater lift station, new sanitary sewer force main, alteration of wastewater treatment lagoons, modifications to wastewater collection system, and miscellaneous other work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Cloud, Minnesota is soliciting proposals from qualified consultant engineering firms to provide professional design services for the Improvements and Rehabilitation of Wastewater Lift Station No. 51, also referred to as the Main Lift Station (MLS). The selected Consultant will evaluate existing facilities, develop improvements, prepare design documents, provide probable construction cost opinions, and support the bidding process.
Posted Date
Jan 30, 2026
Due Date
Feb 26, 2026
Release: Jan 30, 2026
Close: Feb 26, 2026
The City of St. Cloud, Minnesota is soliciting proposals from qualified consultant engineering firms to provide professional design services for the Improvements and Rehabilitation of Wastewater Lift Station No. 51, also referred to as the Main Lift Station (MLS). The selected Consultant will evaluate existing facilities, develop improvements, prepare design documents, provide probable construction cost opinions, and support the bidding process.
AvailableProvide wastewater treatment plant improvements.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide wastewater treatment plant improvements.
AvailableThe City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
Posted Date
Jan 7, 2026
Due Date
Mar 4, 2026
Release: Jan 7, 2026
Close: Mar 4, 2026
The City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →