Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Division I portion of the project consists of: manhole rehabilitation, gravity sewer main rehabilitation with cure-in-place pipe lining, various collection system lateral and mainline repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Work include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
Posted Date
Jan 7, 2026
Due Date
Mar 4, 2026
Release: Jan 7, 2026
Close: Mar 4, 2026
The City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
AvailableIncludes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Includes rehabilitation and improvements to the existing wastewater treatment system, the sewage pumping system, and the sewer gravity system. Installation of new aerators at the wastewater treatment facility, levee repairs at the lagoon, chlorine contact chamber improvements, and membrane liner anchorage repairs for the base bid. The alternate bid work shall include sludge removal, dewatering, and disposal offsite, as well as pump station rehabilitation work and collection system rehabilitation.
AvailableWork includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Posted Date
Dec 4, 2025
Due Date
Feb 25, 2026
Release: Dec 4, 2025
Close: Feb 25, 2026
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →