Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Submerged attached growth reactor (SAGR) and lagoon aeration system equipment. Furnishing all material, equipment, labor, and manufacturer's design for a new aerated lagoon system and SAGR. Includes, but is not limited to, all manufacturer provided equipment and materials including aeration system, SAGR system, blowers, blower controls, and all necessary manufacturer appurtenances. Section 2: sludge removal and general civil, architectural, structural, electrical, controls, process and other work, and construction per drawings and specifications. Furnishing all material, equipment, labor not included in section 1 for the SAGR and lagoon aeration system to become complete and fully operational. Includes, but is not limited to, SAGR structure, UV/blower structure, lift station building, lift station, electrical and controls improvements, miscellaneous concrete structures, splash pads, piping, valves, process piping, and all necessary appurtenances not included in section furnishing all material, equipment, labor necessary for the decommissioning of the existing lagoon cells, including but not limited to, structures, piping, valves and appurtenances, sludge removal and disposal, as indicated in the drawings and specifications. Work also includes grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the work in accordance with drawings and specifications. Furnishing all material, equipment, labor necessary for removal and disposal of sludge from existing lagoon cells as indicated in the drawings and specifications. Allowance: lump sum allowance shall be included in the bid total for locating and furnishing top soil material in excess of what is available at the site and associated hauling costs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes wastewater system improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes wastewater system improvements.
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableProvide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
AvailableThis RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis