Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2 EA replace brush aerator control panel; 1 LS replace bar screen control panel; 1 LS replace bar screen brushes; 1 LS replace disc aerator bearings; 1 LS clarifier gearbox oil change; 1 LS calibrate weirs for even flow distribution; 1 LS replace primary and provide backup chlorine pump; 1 LS replace primary and provide backup sodium bisulfate pump; 1 LS replace ultrasonic flow meter; 1 LS reroute chlorine plumbing under concrete; 1 LS chlorine and sodium bisulfate chemical feed setup; 3 EA replace 4" drying bed plug valves; 1 LS replace anthracite and gravel media in drying beds. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes wastewater system improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes wastewater system improvements.
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableThis RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
AvailableProcurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis