Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor will furnish and install equipment to upgrade the city's existing sewer and monitoring system. Project is a lump sum turnkey and includes supply and install of equipment per manufacturers specifications. Contractor will deploy a sewerage monitoring system that will be resilient, scalable industrial internet of things (lloT) communication infrastructure across the municipality's service area. The system shall enable seamless integration of an unlimited number of communication devices using both licensed and unlicensed wireless networks, including but not limited to LoRaWAN.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
Posted Date
Jan 15, 2026
Due Date
Feb 24, 2026
Release: Jan 15, 2026
Close: Feb 24, 2026
Removal and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
AvailableSeeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Seeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
Work includes, but is not limited to, installation of approximately 8300 feet of 28" HDPE force main, installation of 438 feet of 36" steel casing pipe by jack and bore, the upgrade of four (4) existing lift stations, installation of about 5600 feet of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 feet of 8-inch and 10-inch sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work required for completion of the project.
Posted Date
Apr 11, 2024
Due Date
Feb 12, 2026
Release: Apr 11, 2024
Close: Feb 12, 2026
Work includes, but is not limited to, installation of approximately 8300 feet of 28" HDPE force main, installation of 438 feet of 36" steel casing pipe by jack and bore, the upgrade of four (4) existing lift stations, installation of about 5600 feet of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 feet of 8-inch and 10-inch sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work required for completion of the project.
This solicitation requests proposals for polymer system upgrades at a wastewater treatment facility in Rhode Island. The posting was published on January 21, 2026, and solicits bids through the closing date of February 10, 2026, at 10:00 AM EST. Detailed specifications and bid documents are available on the buyer-managed portal but require registration to access.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
This solicitation requests proposals for polymer system upgrades at a wastewater treatment facility in Rhode Island. The posting was published on January 21, 2026, and solicits bids through the closing date of February 10, 2026, at 10:00 AM EST. Detailed specifications and bid documents are available on the buyer-managed portal but require registration to access.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis