Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes, but is not limited to, installation of approximately 8300 feet of 28" HDPE force main, installation of 438 feet of 36" steel casing pipe by jack and bore, the upgrade of four (4) existing lift stations, installation of about 5600 feet of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 feet of 8-inch and 10-inch sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work required for completion of the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 9,600 LF of 24" force main, installation of 220 feet of 30" steel casing pipe by jack and bore, the upgrade of five (5) existing lift stations, construction one large lift station, installation of about 5,600 LF of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 LF of 8" and 10" sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Installation of approx. 9,600 LF of 24" force main, installation of 220 feet of 30" steel casing pipe by jack and bore, the upgrade of five (5) existing lift stations, construction one large lift station, installation of about 5,600 LF of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 LF of 8" and 10" sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work
AvailableRemoval and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
Posted Date
Jan 15, 2026
Due Date
Feb 24, 2026
Release: Jan 15, 2026
Close: Feb 24, 2026
Removal and replacement of the existing Wastewater and Water SCADA system. Work includes on-site radio frequency communications, master SCADA control panel, SCADA computer and general electrical labor.
AvailableSeeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Seeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Posted Date
Sep 10, 2025
Due Date
Jan 29, 2026
Release: Sep 10, 2025
Close: Jan 29, 2026
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →