Town of Maury City
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Canadian
Wastewater collection system and treatment improvements including a comprehensive evaluation of the treatment processes and the collection system.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Town of Canadian
Close: Dec 1, 2025
Wastewater collection system and treatment improvements including a comprehensive evaluation of the treatment processes and the collection system.
AvailableChester Water Authority
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Chester Water Authority
Close: Jan 14, 2026
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
AvailableCity of Alcester
Furnish and Install 3,900 to 4,500 feet of 8 sanitary sewer CIPP lining (Various Bid Alts.); Furnish and Install 390 feet of 10 sanitary sewer CIPP lining (Bid Alt. 3); Furnish and Install sanitary sewer CIPP short liner patch (Bid Alt. 2); Furnish and Install 56 lateral liners with cleanouts; Furnish and Install 12 to 19 blind lateral liners (Various Bid Alts.); Rehabilitation of 14 to 16 manholes consisting of approximately 174 vertical feet (Various Bid Alts.);
Posted Date
Aug 14, 2025
Due Date
Dec 18, 2025
Release: Aug 14, 2025
City of Alcester
Close: Dec 18, 2025
Furnish and Install 3,900 to 4,500 feet of 8 sanitary sewer CIPP lining (Various Bid Alts.); Furnish and Install 390 feet of 10 sanitary sewer CIPP lining (Bid Alt. 3); Furnish and Install sanitary sewer CIPP short liner patch (Bid Alt. 2); Furnish and Install 56 lateral liners with cleanouts; Furnish and Install 12 to 19 blind lateral liners (Various Bid Alts.); Rehabilitation of 14 to 16 manholes consisting of approximately 174 vertical feet (Various Bid Alts.);
AvailableRiver Valley Regional Commission
The City of Reynolds seeks engineering services for sewer, water, or street and drainage improvements under a Community Development Block Grant. The selected engineer will provide a preliminary report, final design, and manage construction and project closeout, including NPDES services and BABA documentation. Proposals are due by December 8, 2025.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
River Valley Regional Commission
Close: Dec 8, 2025
The City of Reynolds seeks engineering services for sewer, water, or street and drainage improvements under a Community Development Block Grant. The selected engineer will provide a preliminary report, final design, and manage construction and project closeout, including NPDES services and BABA documentation. Proposals are due by December 8, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database