Lift Station at Street: 1 LS install barnes submersible pump (supplied by the town); 1 ea new 4" base elbow for submersible pump; 1 LS provide barnes 4sHDF3074-230/2 submersible pump with new 4" base elbow; 8 ea provide and install new upper guide rail brackets; 1 LS provide by-pass pumping during constrcution; 1 LS provide working SCADA for lift station (Utilizing existing sensaphone 400) 2 ea replacement of power and sensor cable in existing barnes submersable pump; 1 LS install new climb barrier on existing fence at lift station; 2 ea provide new stainless steel ("SS") lifting chains with SS clevis. Lift Station at Football Practice Field: 1 LS install barnes submersible pump (supplied by the town); 1 ea new 4" base elbow for submersible pump; 1 LF provide barnes 4SHDF3074-230/1 submersible pump with new 4" base elbow; 8 ea provide and install new upper guide rail brackets; 1 LS provide by-pass pumping during construction; 1 LS provide working SCADA for lift station (Utilizing existing sensaphone 400) 2 ea replacement of power and sensor cable in existing barnes submersable pump; 110 LF install new 6' chain link fence with climb barrier and double 6' wide gate; 1 LS provide and instal l4" check valve in existing valve vault; 2 ea provide new stainless steel ("SS") lifting chains with SS clevis;
Lift Station at Street: 1 LS install barnes submersible pump (supplied by the town); 1 ea new 4" base elbow for submersible pump; 1 LS provide barnes 4sHDF3074-230/2 submersible pump with new 4" base elbow; 8 ea provide and install new upper guide rail brackets; 1 LS provide by-pass pumping during constrcution; 1 LS provide working SCADA for lift station (Utilizing existing sensaphone 400) 2 ea replacement of power and sensor cable in existing barnes submersable pump; 1 LS install new climb barrier on existing fence at lift station; 2 ea provide new stainless steel ("SS") lifting chains with SS clevis. Lift Station at Football Practice Field: 1 LS install barnes submersible pump (supplied by the town); 1 ea new 4" base elbow for submersible pump; 1 LF provide barnes 4SHDF3074-230/1 submersible pump with new 4" base elbow; 8 ea provide and install new upper guide rail brackets; 1 LS provide by-pass pumping during construction; 1 LS provide working SCADA for lift station (Utilizing existing sensaphone 400) 2 ea replacement of power and sensor cable in existing barnes submersable pump; 110 LF install new 6' chain link fence with climb barrier and double 6' wide gate; 1 LS provide and instal l4" check valve in existing valve vault; 2 ea provide new stainless steel ("SS") lifting chains with SS clevis;
Work includes replacement of a can station with a duplex submersible lift station. Including meter chamber and all associated demolition, bypass pumping, equipment, valves, piping, mechanical, electrical, controls, and site work; conversion of a can station to a duplex submersible lift station utilizing part of the existing wet well structure; including valve chamber, meter chamber, and relocation of existing automatic transfer switch. Including all associated demolition, bypass pumping, equipment, valves, piping, mechanical, electrical, controls, and site work. See attached file.
Work includes replacement of a can station with a duplex submersible lift station. Including meter chamber and all associated demolition, bypass pumping, equipment, valves, piping, mechanical, electrical, controls, and site work; conversion of a can station to a duplex submersible lift station utilizing part of the existing wet well structure; including valve chamber, meter chamber, and relocation of existing automatic transfer switch. Including all associated demolition, bypass pumping, equipment, valves, piping, mechanical, electrical, controls, and site work. See attached file.
Construct a 1,000 gpm triplex wastewater lift station including wet well and valve vault, electrical power and controls, pumps, piping and valves and a standby emergency generator, site work including sheet pile/soldier pile shoring, cast in place concrete retaining wall, demolition of structure, excavation and haul, site grading, gravel surfacing and heated concrete driveway, site piping including 1" water service, hot box, RPBA, and site improvements including a jib crane, fencing and dates. Install approx. 1,000 LF of 8" through 18" gravity sewer mains and manholes. Install approx. 900 LF of 10" and 12" pressure sewer mains. Restore asphalt surfacing, concrete curbing and sidewalk.
Construct a 1,000 gpm triplex wastewater lift station including wet well and valve vault, electrical power and controls, pumps, piping and valves and a standby emergency generator, site work including sheet pile/soldier pile shoring, cast in place concrete retaining wall, demolition of structure, excavation and haul, site grading, gravel surfacing and heated concrete driveway, site piping including 1" water service, hot box, RPBA, and site improvements including a jib crane, fencing and dates. Install approx. 1,000 LF of 8" through 18" gravity sewer mains and manholes. Install approx. 900 LF of 10" and 12" pressure sewer mains. Restore asphalt surfacing, concrete curbing and sidewalk.