Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructing concrete encasement caps along existing sheet piles and placement of erosion control riprap. The work generally consists of the following sites: eastside estates dam 1, eastside estates dam 2, eastside estates dam 3, and ward county dam 1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the inspection and improvements of the Verdigris River Low-Head Dam.
Posted Date
Nov 19, 2026
Due Date
Feb 5, 2027
Release: Nov 19, 2026
Close: Feb 5, 2027
Procurement of services for the inspection and improvements of the Verdigris River Low-Head Dam.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mobilization; clearing, grubbing & site preparation; erosion & sediment control; traffic control; temporary cofferdam; 71 cy concrete dam repair; 18 cy rock riprap (d50=18"); miscellaneous concrete repair; cofferdam evacuation. Installation of construction and traffic control signs. Clearing, grubbing and demolition required for this work includes, but is not necessarily limited to: removal of trees, stumps, debris, and brush. Trimming and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal. Removal and disposal of miscellaneous abandoned subsurface structures and debris that may be discovered during the work. See outside link.
Posted Date
Sep 5, 2025
Due Date
Feb 5, 2026
Release: Sep 5, 2025
Close: Feb 5, 2026
Mobilization; clearing, grubbing & site preparation; erosion & sediment control; traffic control; temporary cofferdam; 71 cy concrete dam repair; 18 cy rock riprap (d50=18"); miscellaneous concrete repair; cofferdam evacuation. Installation of construction and traffic control signs. Clearing, grubbing and demolition required for this work includes, but is not necessarily limited to: removal of trees, stumps, debris, and brush. Trimming and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal. Removal and disposal of miscellaneous abandoned subsurface structures and debris that may be discovered during the work. See outside link.
AvailableWork consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
AvailablePark lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
Park lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.