Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
CIPP lining of existing sewer mains in the Communities. There will be limited spot repair and some manhole replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
Close: Jan 7, 2026
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
AvailableWork includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
AvailableWork includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.