Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
CIPP lining of existing sewer mains in the Communities. There will be limited spot repair and some manhole replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of approx 11,000 FT of 18" gravity sewer; 43 new manholes; and all related appurtenances.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Project consists of approx 11,000 FT of 18" gravity sewer; 43 new manholes; and all related appurtenances.
AvailablePremium
Access the largest public sector contact database
Work includes re-line and reconstruct existing dry sewer line. The gravity lines, service lines and some force main/lpfm will need to be cleaned, videoed and then roots/obstructions removed, cleaned, relined, lateral services cut and relined, tested. Some lines may need to be repaired and relocated if settlements encountered.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Work includes re-line and reconstruct existing dry sewer line. The gravity lines, service lines and some force main/lpfm will need to be cleaned, videoed and then roots/obstructions removed, cleaned, relined, lateral services cut and relined, tested. Some lines may need to be repaired and relocated if settlements encountered.
AvailableThe City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
AvailableWork consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
Close: Jan 7, 2026
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis