Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cap and plug existing stand-pipe system in common area corridors - cap existing stand-pipe connection to domestic supply in crawl space beneath building; Installation of stand-pipes in stairwell; Installation of floor control valves in corridor; System shall be tied into the existing fire pump and pressure tested for proper peration
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of St. Louis Board of Public Service is soliciting bids for Tower Grove Connector, Phase 2, which extends multimodal improvements along Sarah Street to connect the corridor with the Brickline Greenway near the Cortex MetroLink Station. The work includes a protected cycle track, upgraded bicycle facilities, traffic signal upgrades and interconnection, and pedestrian improvements to enhance safety and connectivity. Bids are submitted via Bid Express by the advertised deadline.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
The City of St. Louis Board of Public Service is soliciting bids for Tower Grove Connector, Phase 2, which extends multimodal improvements along Sarah Street to connect the corridor with the Brickline Greenway near the Cortex MetroLink Station. The work includes a protected cycle track, upgraded bicycle facilities, traffic signal upgrades and interconnection, and pedestrian improvements to enhance safety and connectivity. Bids are submitted via Bid Express by the advertised deadline.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Louis Board of Public Service is soliciting bids for Tower Grove Connector, Phase 2, which extends multimodal improvements along Sarah Street to connect the corridor with the Brickline Greenway near the Cortex MetroLink Station. The work includes a protected cycle track, upgraded bicycle facilities, traffic signal upgrades and interconnection, and pedestrian improvements to enhance safety and connectivity. Bids are submitted via Bid Express by the advertised deadline.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
The City of St. Louis Board of Public Service is soliciting bids for Tower Grove Connector, Phase 2, which extends multimodal improvements along Sarah Street to connect the corridor with the Brickline Greenway near the Cortex MetroLink Station. The work includes a protected cycle track, upgraded bicycle facilities, traffic signal upgrades and interconnection, and pedestrian improvements to enhance safety and connectivity. Bids are submitted via Bid Express by the advertised deadline.
AvailableProvide consultant services for the sycamore trail phase iv and v feasibility study.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Provide consultant services for the sycamore trail phase iv and v feasibility study.
AvailablePre-fabricated fire training tower. 1 EA. See attached file.
Posted Date
Dec 23, 2025
Due Date
Jan 23, 2026
Release: Dec 23, 2025
Close: Jan 23, 2026
Pre-fabricated fire training tower. 1 EA. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →