CityCT
Posted
Aug 17, 2026
Sep 22, 2026
Wakeman Town Farm Barn - Electrical
All work as noted on Drawings E-1 & E-2. All electrical as required for HW & HVAC units.
Description: Provide all site work per site drawings C-1.0 - C-3.0 prepared by Designer, except roof drains and related Coltec units, are boy others. Removal and re-installation of any fencing.
City · CT, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityCT
Posted
Aug 17, 2026
Sep 22, 2026
All work as noted on Drawings E-1 & E-2. All electrical as required for HW & HVAC units.
CityCT
Posted
Aug 17, 2026
Sep 22, 2026
All HVAC units as noted on M-1 & M-2. Electrical work will be provided by others under a separate agreement. Supply and install all plumbing fixtures. Supply and install all toilet accessories Construction of toilet room walls.
CityCT
Posted
Aug 17, 2026
Sep 22, 2026
Scope of work includes the following: All footings, slabs and exterior concrete walks. Vapor barrier, foundation & under slab insulation. Gravel base and soil compaction as required. Install sanitary sewer line from toilet room to 5 FT outside building. Exterior landings and steps. Layout of foundation.
CityCT
Posted
Aug 17, 2026
Sep 22, 2026
Supply and install all material as required for the building shell, including all interior partitions, on a foundation provided by others. All windows and doors are to be included. Cabinets are not included. Panelized or prefabricated construction is an accepted alternative.
Decision makers connected to this RFP from Town of Westport.