Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 25 LF of 14' high sliding security gate and all associated equipment and infrastructure; install temporary orange safety cones and/or fencing around perimeter of work area; existing temporary fence to remain in place during construction. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes county detention center energy plant and admin roof replacement.
Posted Date
Oct 30, 2025
Due Date
Dec 16, 2025
Release: Oct 30, 2025
Close: Dec 16, 2025
Work includes county detention center energy plant and admin roof replacement.
Premium
Access the largest public sector contact database
Courthouse and detention center security transaction windows upgrade.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Courthouse and detention center security transaction windows upgrade.
AvailableRoof replacement project. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Roof replacement project. See attached file.
AvailableThis IFB solicits contractors to remove and replace roofing at the Shuman Juvenile Detention Center, including removal of approximately 82,600 square feet of existing modified bitumen roofing, replacement insulation, and installation of a fully adhered EPDM roofing system with a 30-year warranty, plus structural and skylight repairs. The project also includes design and installation of a solar photovoltaic (PV) system with new electrical utility service (coordination with Duquesne Light Company required), and the solicitation is organized into prime contracts for General Construction and Electrical Construction.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
This IFB solicits contractors to remove and replace roofing at the Shuman Juvenile Detention Center, including removal of approximately 82,600 square feet of existing modified bitumen roofing, replacement insulation, and installation of a fully adhered EPDM roofing system with a 30-year warranty, plus structural and skylight repairs. The project also includes design and installation of a solar photovoltaic (PV) system with new electrical utility service (coordination with Duquesne Light Company required), and the solicitation is organized into prime contracts for General Construction and Electrical Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis