Alderwood Water And Wastewater District
Work under this contract is to replace existing isolation valves and installing new tees for pipe access on the district's 24" & 30" ductile iron (di) potable water transmission mains at three (3) separate site locations and includes: installation of one (1) 16" butterfly valve, one (1) 24" butterfly valve, three (3) 30" district supplied butterfly valves with appurtenances; installation of one (1) 30" by 16" tee, two (2) 30" by 24" tees and one (1) precast concrete access vault with appurtenances for pipe access; removal and replacement of approximately 50 linear feet of 12" diameter di water main with 16" diameter water main, including replacement of two (2) 12" diameter gate valves, fittings, appurtenances, and installation two (2) new 12" insertion valves at one site location; removal and replacement of impacted storm drain at site 3-06b; removal, hauling, and disposal of existing transmission main piping, water main piping, valves, appurtenances; roadway and property restoration, site cleanup, and temporary traffic control.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chester Water Authority
Arv replacements on arterial transmission mains. Including 7 ea Simple Air Release Valves with 5'x5' Chamber in Public ROW, Complete in place; 1 ea M2-46 Air Release Valve with 5'x5' Chamber in CWA Easement, Complete in place; 2 ea Full Repair, Simple Air Release Valves, Complete in place.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Chester Water Authority
Close: Nov 18, 2025
Arv replacements on arterial transmission mains. Including 7 ea Simple Air Release Valves with 5'x5' Chamber in Public ROW, Complete in place; 1 ea M2-46 Air Release Valve with 5'x5' Chamber in CWA Easement, Complete in place; 2 ea Full Repair, Simple Air Release Valves, Complete in place.
City of Everett
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
Posted Date
Apr 15, 2025
Due Date
Nov 18, 2025
Release: Apr 15, 2025
City of Everett
Close: Nov 18, 2025
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
West Morgan-East Lawrence Water And Sewer Authority
Installation of approximately 4,000 L.F. of 8" CL. 200 PVC water lines; D.I. fittings, valves, and valve markers; water service line; 1,600 L.F. of 6" CL. 200 PVC water lines; D.I. fittings, valves, and valve markers; water service line.
Posted Date
Nov 11, 2025
Due Date
Dec 11, 2025
Release: Nov 11, 2025
West Morgan-East Lawrence Water And Sewer Authority
Close: Dec 11, 2025
Installation of approximately 4,000 L.F. of 8" CL. 200 PVC water lines; D.I. fittings, valves, and valve markers; water service line; 1,600 L.F. of 6" CL. 200 PVC water lines; D.I. fittings, valves, and valve markers; water service line.
AvailableCity of Pittston
Provide window and partial sidewalk replacement. Contract no. 1: general construction contract no. 2: asbestos abatement.
Posted Date
Sep 9, 2025
Due Date
Nov 24, 2025
Release: Sep 9, 2025
City of Pittston
Close: Nov 24, 2025
Provide window and partial sidewalk replacement. Contract no. 1: general construction contract no. 2: asbestos abatement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis