Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall consist of approx 105" dia of clearing and grubbing; 190 CY of common excavation; 230 TON of base aggregate dense; 30 SY of concrete driveway; 170 LF of concrete curb & gutter; 25 LF of storm sewer pipe & associated structures; 97 LF of ductile iron water main pipe & associated structures; 60 LF of water service piping; 80 LF of sanitary sewer main & associated structures; 75 LF of sanitary sewer lateral piping; 75 TON of HMA pavement; 3 EA signs 320 SY of restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking consulting engineering services for the design and construction support of a 1.8-mile roadway extension and new outer road construction.
Posted Date
Jan 5, 2026
Due Date
Jan 26, 2026
Release: Jan 5, 2026
Close: Jan 26, 2026
Seeking consulting engineering services for the design and construction support of a 1.8-mile roadway extension and new outer road construction.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Storm sewer and roadway improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Storm sewer and roadway improvements.
AvailableThe City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
The City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Available1,590 LF of 8" sanitary sewer pipe lining; 21,905 SF of sidewalk removal; 3,100 LF of curb and gutter removal; 3,950 SY of existing roadway removal; 3,200 tons of 1-1/4" crushed aggregate; 3,100 LF of 30" curb and gutter; 1,250 tons of HMA pavement (alternate bid); 3,950 SY of 8" concrete pavement (base bid); 13,355 SF of 4" concrete sidewalk; 3,110 SY of topsoil and sod; 1,400 LF of watermain relay.
Posted Date
Jan 7, 2026
Due Date
Jan 23, 2026
Release: Jan 7, 2026
Close: Jan 23, 2026
1,590 LF of 8" sanitary sewer pipe lining; 21,905 SF of sidewalk removal; 3,100 LF of curb and gutter removal; 3,950 SY of existing roadway removal; 3,200 tons of 1-1/4" crushed aggregate; 3,100 LF of 30" curb and gutter; 1,250 tons of HMA pavement (alternate bid); 3,950 SY of 8" concrete pavement (base bid); 13,355 SF of 4" concrete sidewalk; 3,110 SY of topsoil and sod; 1,400 LF of watermain relay.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →