Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 25 LF compost filter sock (12"); 17 SY rip-rap apron, r-4 rock; 2 EA storm sewer manhole, 4' dia; 18 LF 18" smooth lined corrugated polyethylene pipe; 80 LF 30" smooth lined corrugated polyethylene pipe; 10 SY base repair superpave asphalt mixture design, base course, pg 64s-22, 0.3 to <3 million esals, 25.0 mm mix, 3" depth; 18 LF concrete curb; 13 SY concrete sidewalk; 30 LF remove and reset fence, chain link. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of drainage improvements, specifically bank stabilization, for Adeline St & Johnson St.
Posted Date
Dec 25, 2025
Due Date
Jan 26, 2026
Release: Dec 25, 2025
Close: Jan 26, 2026
Construction of drainage improvements, specifically bank stabilization, for Adeline St & Johnson St.
AvailableThe City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
City of Joplin requests sealed bids for sale of parcel E. Furnace St - W of St. Louis (Lot 3 Block 44), approx. 5,525 sq ft; minimum bid $2,652.00. Bids must be submitted in sealed, clearly marked envelopes to the Finance Department at 602 S Main St (label as specified). Property conveyed by Quit Claim Deed; buyer assumes closing costs if closing at CB Title Company. Contact: Ethan McAfee, 417-624-0820 ext. 1239.
Posted Date
Dec 3, 2025
Due Date
Jan 2, 2026
Release: Dec 3, 2025
Close: Jan 2, 2026
City of Joplin requests sealed bids for sale of parcel E. Furnace St - W of St. Louis (Lot 3 Block 44), approx. 5,525 sq ft; minimum bid $2,652.00. Bids must be submitted in sealed, clearly marked envelopes to the Finance Department at 602 S Main St (label as specified). Property conveyed by Quit Claim Deed; buyer assumes closing costs if closing at CB Title Company. Contact: Ethan McAfee, 417-624-0820 ext. 1239.
Roadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Roadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis